EzeeCleans

    A site ready for handover on the day it was promised

    Send us the plans or walk the site with us. We price each stage and book the final clean against your handover date.

    Typical time on site
    Staged. A fit-out final clean often takes one to three days depending on size and how many trades are still on site.
    Pricing
    Fixed quote, upfront
    Cleaner at the sliding doors of a newly built, empty room

      A builders' clean runs in stages, and the final one decides whether handover happens on time. New finishes are easy to damage, so the method changes with the surface: blades held flat on glass, the right solvent on sticker glue, plaster dust vacuumed before anything wet touches it.

      What's on the list

      This is the checklist we work from. Your quote confirms it for your place.

      • Rough clean: rubbish, offcuts and packaging cleared, floors swept
      • Plaster dust vacuumed from floors, sills, ledges and joinery
      • Paint, render and silicone residue removed from glass and hard surfaces
      • Protective film and stickers removed from windows, appliances and fittings
      • Window frames, tracks and glass cleaned inside
      • Joinery wiped inside and out, including drawers and shelves
      • Tapware, sinks, basins and fittings cleaned
      • Light switches, power points and door hardware wiped
      • Hard floors mopped and carpet vacuumed
      • Touch-up clean on the morning of handover if booked

      Worth knowing before you book

      Tell us if there is no power or water
      Some sites are not connected yet. We can plan around it, but it changes the equipment we bring and the time on site.
      Trades still on site slow the final clean
      The final clean works best once trades are out. If they are still working, we will plan the sequence around them and may suggest a later touch-up.
      Protective film gets harder with time
      Film left in the sun for months turns brittle and leaves glue behind. Remove it sooner if the programme allows.

      How it runs

      1. 1

        Site walk-through

        We walk the site with the site manager, note finishes and residue, and confirm power, water, lift and parking access.

      2. 2

        Written scope by stage

        Rough, final and handover stages are listed with what each includes and when they are booked.

      3. 3

        Clean to the programme

        Each stage runs to your programme. The final clean is staffed to finish inside its window.

      4. 4

        Defect walk and touch-up

        We walk it with you before handover and deal with anything picked up on the defect list that is a cleaning item.

      Common questions

      Do you do all three stages?

      Yes, or just the final and handover stages if another contractor did the rough clean.

      Can you clean floor by floor as levels finish?

      Yes. On multi-level jobs we can clean and hand back each floor as it is completed.

      Do you remove builders' rubbish?

      We clear loose rubbish into your skip or bins. Skip hire and large-volume removal stay with the builder unless agreed.

      Do you do external windows on multi-storey sites?

      Low-level external glass is part of the scope. Higher glass depends on access, and we will tell you if a job needs a specialist.

      5.0 CallFree quote